Productivity is expressed generally as =
Yes, the answer is correct.
Score: 1
Accepted Answers:
1 point
Productivity can be increased;
Yes, the answer is correct.
Score: 1
Accepted Answers:
1 point
According to ASME, the symbol used for inspection is;
Yes, the answer is correct.
Score: 1
Accepted Answers:
1 point
Work measurement is the application of techniques designed to establish the time for a qualified worker to carry out specified jobs at a defined level of performance.
Yes, the answer is correct.
Score: 1
Accepted Answers:
1 point
In a stop-watch time study, the observed time was recorded as 0.20 minute, the performance rating factor was 115 on the scale of 100 as normal (percentage scale). What is the standard time in minutes if 10% allowances are permitted?